Description:
The current hospital of Aruba is in need of expansion and renovation. Stichting Onroerend Goed Aruba (SOGA) has developed a plan which consist of the construction of a new bed tower, a new medical office building (MOB, to be build by another contractor) and the renovation of the existing buildings. Arellano is the General Contractor (GC) for this total project. Albo N.V. will act as a subcontractor on the construction of the new bed tower. All electrical, mechanical, data etc. works are excluded from the scope of works of Albo N.V. and the joint venture. These works will be executed by Croon and CHS.
Coordination in all phases of the project is part of the scope of Arellano. The project mainly consists the following: The construction of the new bed tower. Located behind the existing buildings a six stored building will be erected. Total surface is approximately 10.000 m2. The building consists of a in situ concrete structure, columns and floors. The exterior façade consists of masonry and aluminum windows.